Horizon Towers · Backing Research

Era 2 · 2004–2011

Cascade of secondary failures. Budget-driven deferral. Stucco and balconies surface.

About this document. This is AI-aided analytical research drawn from the Horizon Towers minutes corpus. The quoted passages are direct quotations from board minutes; interpretations and "Implication" / "Summary" notes are working hypotheses based on those quotes. Compiled by Brad Pollard with AI assistance.

Horizon Towers Condominium Association

Era 2: 2004-2011 Moisture & Leak Audit

Board Minutes Chronology

Extraction covers: Water/moisture issues, leak repairs, drainage problems, garage roof conditions, and board response patterns (professional consultations, authorized repairs, patch attempts, deferred work).

2005

Summary: 13 new issue(s); 5 patch/paint attempt(s); 1 authorized repair(s).

2006

Summary: 6 new issue(s); 1 professional consultation(s); 3 authorized repair(s).

2007

Summary: 21 new issue(s); 2 patch/paint attempt(s); 7 professional consultation(s); 11 authorized repair(s).

2008

Summary: 37 new issue(s); 9 patch/paint attempt(s); 1 professional consultation(s); 6 authorized repair(s).

2009

Summary: 28 new issue(s); 2 professional consultation(s); 2 authorized repair(s).

2010

Summary: 40 new issue(s); 9 patch/paint attempt(s); 4 professional consultation(s); 12 authorized repair(s).

2011

Summary: 5 new issue(s); 1 professional consultation(s); 8 authorized repair(s).

2012

Summary: 2 new issue(s); 1 authorized repair(s); 1 deferred repair(s).